Back to Use Cases
B2B SAASUX REDESIGN

Onboarding redesign briefed Monday, shipped Thursday — drop-off cut by 62%

A B2B SaaS platform was losing a third of new users during onboarding. They had a clear brief: redesign the flow to reduce friction. Their internal team estimated 3–4 sprints. Runstream shipped the complete redesign in 4 days.

4
Days to Ship
$8.5K
Total Cost
62%
Drop-off Reduction
34%→13%
Onboarding Drop-off
The Challenge

34% of new users never finished setup

The product team knew they had an onboarding problem. Their data showed a 34% drop-off rate during the setup flow — users would sign up, start configuring their workspace, and abandon before completing the process.

The brief

Redesign the 4-step onboarding flow based on the team's existing UX research and Figma mockups. Reduce cognitive load at each step, add smart defaults, simplify integration setup, and add clear progress indicators throughout.

The constraint

Internal engineering estimated 3–4 sprints (6–8 weeks). The product team wanted it live before their next board meeting — 2 weeks away. No engineers available to pull from the roadmap.

What Changed

From overwhelming to progressive

The original flow showed every option at once with no guidance. The redesigned flow uses progressive disclosure, smart defaults, and clear progress indicators at every step.

Before: 34% drop-off
  • All fields required upfront
  • No progress indicators
  • Complex integration setup
  • No smart defaults
After: 13% drop-off
  • Progressive disclosure
  • Visual progress bar
  • One-click OAuth
  • Auto-detected defaults
Execution

From brief to shipped code in 4 days

Day 0

Brief ingestion and scope confirmation

Runstream ingested the Figma mockups, product requirements, and existing analytics data. Scope was confirmed within 4 hours — two parallel execution streams defined.

Days 1–2

Progressive disclosure and smart defaults

Stream 1: Rebuilt the workspace configuration step with progressive disclosure, auto-detected defaults, and a simplified single-field entry. Stream 2 (parallel): Integration flow with OAuth one-click connections.

Days 3–4

Completion states, analytics, and deployment

Progress indicators at every step, celebration moments on completion, skip & return functionality, onboarding analytics dashboard, A/B testing setup, and production deployment.

Progressive Disclosure

Show only what's needed at each step. Reduces cognitive load by 60%.

Smart Defaults

Auto-detect timezone, suggest team size, pre-fill based on signup data.

OAuth Integrations

One-click Slack, GitHub, Jira connections replacing manual API key entry.

Skip & Return

Non-blocking steps can be skipped and completed later.

Progress Indicators

Visual progress bar, step confirmations, and celebration on completion.

Onboarding Analytics

Real-time funnel metrics, per-step conversion tracking, and cohort comparison.

Client Experience

Shipped faster than a single sprint planning session

01

4-hour scoping

Runstream ingested the brief, Figma files, and existing analytics. Scope was confirmed and execution started the same day.

02

Faster than internal

Their engineering team estimated 3–4 sprints. Runstream delivered the complete redesign in 4 days — before the team's next sprint even started.

03

Measurable from day 1

The built-in analytics dashboard meant the team could see the impact immediately. No waiting for a data engineering ticket to track results.

"

We had the designs, we had the analytics, we knew exactly what we wanted built. We just didn't have the engineering hours. Runstream took our brief on Monday and we had the new onboarding flow live on Thursday. Drop-off went from 34% to 13% in the first week. That's not a redesign — that's recovered revenue.

— Head of Product, B2B SaaS Platform
The Results

Clear brief, fast execution, measurable impact

4 days
Delivered
vs. 6–8 weeks internal estimate
$8.5K
Total Cost
Full redesign, analytics, and deployment
62%
Drop-off Reduction
34% → 13% in the first week

The improved flow recovered an estimated $18K/month in revenue from users who would have previously churned during setup. The team's engineers stayed focused on core product work — zero roadmap disruption.

Have a clear brief? Ship it in days, not sprints.

Bring your designs, your scope, your requirements. We'll handle the execution.